               CRITICAL ASSET

                 CHC Elevator

                Modernization






                                                                 Our Elevator Modernization Program began in 2017, after
         Asset  Management  has  invested  $2.4M  in  elevator   a careful assessment of our elevators to provide a design
                                                                 scope  and  specifications  for  CHC's  elevator  systems
         modernization since 2017, with an additional projection of
                                                                 located in our Families, Seniors and Affordable Housing
         $800K to 2028.  Windsor Essex CHC has 27 elevators across
                                                                 Portfolios.  Since  2017  we  have  fully  modernized  13
         13 buildings operating in mid-rise and high-rise properties   elevators at these locations:
         and serving thousands of residents, visitors and employees,
                                                                    ●     Agnes McPhail  Manor 850 Mercer St.
         daily, 24 hours a day, seven days a week.
                                                                    ●      Fontainebleau Towers 2455 Rivard Ave.
         Focusing on improving the safety, quality-of-life and well-  ●      Riggs Manor 4365 Wyandotte St. E.
         being of its residents, CHC will utilize the newest technology,   ●      Mrs. Cameron H. Montrose Apartments
         accessibility standards and readily available modern parts to          445 Glengarry Ave.
         enhance performance, reduce maintenance costs and deliver
                                                                    ●      Cherniak Manor 120 Oak St
         more efficient elevators. We know that building residents,
                                                                    ●      Raymond Desmarais Manor 255 Riverside Dr. E.
         staff and visitors will welcome the investment.
                                                                           *completion 2021
         We aim to create a safe and comfortable environment for all
         passengers  using  the  elevator.  The  improvements  of  ride
         quality  with  the  introduction  of  Variable  Frequency  (VFV)
         Drives provide near-seamless acceleration and deceleration.
         We  have  installed  video  surveillance  systems  in  the  cab
         interior  to  provide  an  additional  level  of  security.  The
         accessibility features included in the modernization program
         allow the building to be welcoming to people of all abilities
         and at every stage of their lives.



         Flooring Study                          Floor coverings are one of the essential components of a building's aesthetics

                                                 and performance. Flooring also represents a significant investment for any
            The flooring study is divided         housing  provider.  The  CHC  Asset  Management  Department  began  a
            into 3 phases:                       comprehensive  review  to  understand  CHC's  flooring  needs  better.  The
                                                 challenge is to recommend a standardized flooring product to be used among
         ●  Phase 1:  Analysing and understanding  all of the six property management districts.
             CHC current flooring
         ●  Phase 2: Researching the flooring
             market, and selecting durable,                      ●  CHC has over 3 million Sq Ft. of flooring to maintain
             appropriate and cost effective                       ●  Approximately 70% of current flooring is VCT
             products for our spaces. Analyzing                  ●  9% Hardwood, and 6% Laminate
             the technical data of 52 flooring
             products and comparing the
             products based on CHC needs.            CHC is currently in phase three of the flooring study. The research
         ●  Phase 3: Testing the recommended         team is weighing the variety of considerations throughout the floor
             products through multiple               specification research process and will be making a recommendation
             installation mock-ups.                  in 2021.